Clients

Internal Concrete Flooring

Project Main Contractor Application Type
Somerfield Supermarket, Howden Clark Construction 1,600m2 traditionally reinforced 300mm Deep Piled Internal Floor Slabs and Mezzanine Floor Slabs
Headlam Carpets Extn, Plymouth Rosco Project Management 650m2 200mm Traditional G’Bearing Internal Floor Slabs
RAF Coningsby Clark Construction 4,200m2 Traditional 150mm deep, Ground Bearing Internal Floor Slab
Big Yellow, Twickenham John Sisk and Son 2,600m2 Flood Pour Internal Ground Bearing Slabs with Permaban Alloy Dry Shake Surface
Morrison’s, Extn, Brough R.N. Wooler 200mm Deep Ground Bearing floor slab With Sika Syntop Classic Grey Dry Shake Surface Hardener
Brighton Street, Hull Admorspace LTD Steel Fibre Ground bearing 200mm Deep Floor Slab
Geoff Barber Construction Grain Store – Hull 1,200m2 of traditional 200mm deep g bearing slab Pumped and laid to FM2 2003 TR34

External Concrete Flooring

Project Main Contractor Application Type
Yale Park, Evesham Laser Build 3,500m2 Flood Pour 175mm Traditional External Slabs
Bretton Street, Dewsbury Clugston Construction 3,000m2 Long Strip 175mm Traditional External Slabs
Foxbridge Way, Normanton Stainforth Construction 11,700m2 Long Strip 175mm Traditional External Slabs
Centrum 100 Opus Axis Baggaley Construction 11,200m2 traditional long strip 175mm slabs
Autotrail Extension, Grimsby Havercroft Construction 6,000m2 flood pour external 200mm deep slabs

Joint Sealant

Project Main Contractor Application Type
Old Goole Fields R B Philippson 216 linear metres
Bretton Park, Dewsbury Clugston Construction 8,700 linear metres
Havelock Street, Hull Wold Construction 260 linear metres
Barratt Steel, Scunthorpe Havercroft Construction 370 linear metres

Floor grinding, repair contracts and slab removal

Project Main Contractor Application Type
Constellation Europe, Avonmouth Matthew Clark Drinks Expansion joint repairs, re sealing of construction joints, installation of stress relieving sections
Tesco Distribution Centre, Goole Bowmer & Kirkland Repairs to racking uplift impact damage. Epoxy infill to steel fibre floor and crack repairs
Bradford University Stainforth Construction Removal of 250mm deep pre cast planks and 50mm top screed utilizing diamond bladed saws, core drilling motorized dumper
South Stand, Headingley Stadium, Leeds Caddick Construction Repairs and grinding off to concrete terracing. (see news article)