Sub Base Grading.

Project: Sub Base Grading

Location: Norwich

  • Nationwide Diamond Group
  • Nationwide Diamond Group
  • Nationwide Diamond Group
  • Nationwide Diamond Group

Nationwide Diamond Contracts recently carried out the final 60mm sub base grading to 3000m2 using our in-house Laser guided equipment.

Nationwide Concrete flooring arrived on site installed RCR Flooring Products rail in line with the engineers requirements along with column isolation. 
Over 500m3 of 175mm of concrete  was installed utilising our Somero S22E to the Concrete societies latest FM2 specification in Norwich for a new client in just three days.

For all your Concrete flooring requirements contact us on sales@nd-group.com or call us on 01405 704722.

Sub Base Grading
15th anniversary

2018 Celebrating our 15th Anniversary

Our Latest News

Partnership with the Hull 4 Heroes Charity!

Nationwide Concrete Flooring are extremely proud to announce as part of our 15 year anniversary celebrations a very special... Read more

Nationwide Concrete Flooring have recently secured this 2000m2 steel reinforced concrete floor slab in Newcastle

Nationwide Concrete Flooring have recently secured this 2000m2 steel reinforced concrete floor slab in Newcastle Upon Tyne. The roof and... Read more

Congratulations to Wyke under 7's!

Congratulations to both the coaching staff and the boys of the Wyke Under 7's for having a great season!... Read more