Final Regulatory Layer of Stone .

Project: Final Regulatory Layer of Stone

Location: Burton upon Trent

  • Nationwide Diamond Group
  • Nationwide Diamond Group
  • Nationwide Diamond Group
  • Nationwide Diamond Group

Nationwide Diamond Contracts are installing the final regulatory layer of stone in preperation of the arrival of the concrete flooring team. 

All of the new units are checked and the levels been achieved by the team are fantastic achieving + - 5mm overall on a 3 metre grid.

Great work by the contracts team!!