Waste Recycling Plant .

Project: Waste Recycling Plant

Location: Hull

  • Nationwide Diamond Group
  • Nationwide Diamond Group
  • Nationwide Diamond Group
  • Nationwide Diamond Group

Nationwide Concrete Flooring installed a 200mm concrete floor into this soon to be recycling plant.

The concrete floor was reinforced with two layers of steel fabric and the customer requested a full powerfloat finish.

Nationwide Diamond Contracts carried out the ground breaking out, the build up of stone and the final sub base utilising their own in house operated equipment prior to the concrete flooring team arriving on site. 

This is the second recylcing centre concrete floor installed in just two weeks by Nationwide Concrete Flooring.

For all your industrial or commercial concrete floor enquiries please do not heistate to get in touch. 

 

Waste Recycling Plant
Waste Recycling Plant
Waste Recycling Plant
15th anniversary

2018 Celebrating our 15th Anniversary

Our Latest News

Nationwide are working with ex armed forces!

Nationwide Concrete Flooring working with the ex armed forces recently sponsored this fantastic event to help raise funds for... Read more

Hull FC take on Hull KR!

Nationwide Concrete Flooring Managed to get some well earned down time over the bank holiday weekend where some of... Read more

Another concrete pump is on its way!!

Nationwide Concrete Pumping have purchased another concrete pump to keep up the current work load and enquiries. To join our... Read more